Max Hydro Power - MHP

    For hydro power plants, there are a lot of constraints and uncertain conditions which impact on their optimization operation like inflow, outflow, limited quantity, market price, power purchase agreement…
    MHP was designed for single and cascade hydro power plants to make strategies, long-term planning, short-term planning and optimal operation to maximize their profit in power market.   
    MHP was developed based on AIMMS (http://www.aimms.com/) platform which is one of the best optimization solution in the world.
     
    Simulations:
    • Reservoir (Elevation and Content)
    • Turbine curve (Discharge – Head - MW).
    • Generator Unit
    • Tail water
    • Inflow
    • Discharge
    • Outflow
    • Spill
    • Maintenance schedule
    • Contract for Difference (CfD contract)
    • Capacity cost
    • Market pricing
     
    Constrains:
    • Limitations of elevations
    • Limitations of tail water
    • Limitations of discharge, spill
    • Limitations of energy
             
     
    Objectives:
    • Maximization energy output
    • Maximization revenue
             
     
    Results:
    • Optimal elevation of reservoir
    • Optimal operation scheduling
    • Optimal bidding