Consulting and building new SCADA system at Se San 3A Joint Stock Company office, this system can connect to DCS system, remote control and supervisory the power plant far from 90 km. The work including: Survey existing Distributed Control System (DCS), gateway system, tele-communication system; Consulting and building system in Gateway configuration, database design and building, software development, Man-Machine Interface building, communication installation and configuration, installation and Integrated system, End – to – end testing.